Unfortunately the rains had set in last week which slowed down the framing. With a few hours here and a few hours there the framers got the house some what dried in so the rough-ins can start.
Living Room Ceiling |
Master Bedroom |
Bonus Room above Garage |
The first to start rough-ins was the HVAC contractor installing the main ducts inside the house. Of course they took up some of my master suit closet and hall closet. They also started drilling the holes for the geo-thermal heat pump lines, 2 holes 300ft each.
Also to show up this week is the windows and the trusses for the detached garage. So time to wrap the house and start putting in some windows and start on the detached garage. Things starting to get a little busy.
Plumbers are suppose to show up this week and get started with their rough ins.