The framers continued on this week in the nice weather getting the house wrapped and getting a few windows in place. Also the HVAC / well contractor finished installing the ground loops for the ground source heat pump. They cleaned up the holes and got the grout down in the holes.
|
Truck equipment with pump to fill holes with grout. |
|
Finished loop hole (1 of 2) |
A few outside update pictures with the wrap and a few windows.
House warp tape should show up early next week to finish off the wrapping, Doors should show up mid week so hopefully we get this thing dried in. After we get the doors up the siding contractor will show up.
Few Interior pictures of rough ins and windows.
|
Master Shower - 2 valves |
Here in the master shower there will be three shower heads, hand held, massage head, and rain head. There is a valve for the hand held an separate valve for the massage and rain head which can let both operate by themselves or together.
|
Master Bath |
|
Master Bedroom |
|
Living Room |
|
HVAC routing |
|
Laundry - mix up, washer should be on left |
Framing contractor ordered the material for shop Friday so framing should start on that next week. They will finish putting the windows and doors in the house first. of course we are still dependent on the weather.