Sorry its been awhile, I've been traveling a bit more plus with it being dark at 5:00 its been hard to get some pictures. So the guys worked over Thanksgiving and got the drywall installed. 4 guys installed 200 sheets in just two days. They finished the mud this week.
Master Bedroom |
Bonus Room |
Bonus Room |
Kitchen |
Living Room |
Zoey's Room |
Living Room |
The siding contractor finally got to finish now that we got the frame in the back door of the kitchen. For now we just have some "loaner doors" in the opening. Looks like the painter got started with the primer coat on Saturday and of coarse he painted the doors that were on loan from the supply store. Wonder who is going to pay for that, I know I'm not. Also the gable truss accents are not looking like what I envisioned so I have the siding guys coming back to take them down and just install some more corbels (knee braces). I hope the painter is waiting for us to move those to finish the front.
We got the inside tile picked out last week so if the price comes back within budget the installer will probably start this week. Also we plan on pouring the detached garage concrete slab this week. I'm going to place an order for some hickory hardwood floors this week so hopefully they will be coming in soon. We also placed the order for the kitchen cabinets this past week so they will be in a few weeks but I need to get the hardwoods floors down first. The cabinets we picked out are painted an off white with a chocolate glaze so we decided to put the hardwoods in the kitchen also. So the only tile floors will be in the laundry and the bathrooms.
No comments:
Post a Comment