Friday, November 23, 2012

Insulation Install


Well we got the spray insulation in this week along with adding the transom above the front door. It took about two days for the guys to spray it let it "grow" and then cut off the excess for the drywall.  
Master Bedroom


Study
Garage Beam / Bonus Room Floor

Bonus Room Knee Walls

Bonus Room

Bonus Room - Batt insulation for sound proofing with staggered stud wall

Living Room
On the living room you can see where the overframing is on the ceiling, basically where the insulation stops.  That means there is a roof framed over top of this framing therefore there is no reason to have insulation at this part.
Attic

Attic
With the attic being completely stilled under the roof sheathing and not the room ceilings, the attic will actually be conditioned space meaning it will have a duct supply air up there and it will only be a few degrees warmer or cooler than the living space below.


Here are a few pictures of the transom above the front door.













As you can see in some of pictures the drywall has been delivered so hopefully that will start soon.

No comments:

Post a Comment