Friday, January 25, 2013

Update

Thought it would be time for another update.  Well the cabinets in the kitchen have been going in but during the installation we noticed a few cabinets are missing unfortunately.  So we'll have to wait till they get in to finish.  Also all the stair pieces came in last week so the carpenter has starting installing those. I had to order all the pieces on-line to match the hickory flooring.  Also another carpenter has been helping out finish the trim molding throughout the house.  We also picked out paint colors and the painter is suppose to come start Tuesday.  The counter top guys came out last Tuesday to make templates of the kitchen and master baths.  The stone for outside was delivered but the outside temperature was to cold for the grout to setup correctly so the guys said they will be back next week once the temperature increases.

We had a few things planned for Friday but the weather changed our plans.  The fireplace box width needs to be increased but the floor installer had wrapped the existing box so we need him to come back out and widen the cut out around the box.  Once that is done, I can complete the window seat.  Hopefully if things work out the plumber and HVAC contractors will be back in two weeks to finish and the electrician will be back in three weeks.






Friday's Weather nothing but ice


No comments:

Post a Comment