Monday, December 24, 2012

Shower Tile

Well the tile contractor got to the master shower before the holiday break and Mandy could not be happier...she did a great job picking out all the tile.


Poured the shower floor




















He also got the master bath floor down along with the laundry and the upstairs bath.

Master Bath Floor

Upstairs Bath

He could not finish the floors where we are transitioning into the hardwood floor until the hardwood is down.  And speaking of hardwood, we are behind schedule with that, its on order but during milling they did not have enough wood so they had to wait for more.  Hopefully we'll be seeing it show up this week.  The cabinets are in, just sitting in a warehouse right now waiting on the floor.  

The electrical contractor came by on Friday and installed the meter box so now we can call Progress Energy to come hook up the house but probably will not do that till we get closer to installing all the outlets and switches.

The contractor started the trim work on the windows once the window manufacturer rep came out and figured out the issue with the windows.  All my double hung windows were missing a gasket that goes under the tracks on each side sealing them under over the sill.  The rep order parts so hopefully those will be in around the 2nd week in January.

Kitchen windows

  

The exterior rock is in but they did not have any corner pieces and they will not be in until the 9th.

Sunday, December 9, 2012

Finish Exterior Paint

The painter almost finished the exterior paint this past week. Just need one more coat on the trim and a few touch-ups here and there.  Hopefully the stone contractor will show up this week so we can wrap up the exterior finish.  We need to add a couple of rows of brick on the front porch to minimize the step into the house, then we can add the stone work and the front porch post, they will be true 8x8 post, big boys, defiantly over kill but will have that stout look.

  


 detached garage is getting ready for the pad pour on Monday if the weather holds out.  Thanks to my man Mark for hooking me up with some rigid insulation to go under the concrete to help if (when :) )I decide to heat the garage later on.

we really need to clean the brick once we get closer to finishing. Part of building, 


The tile contractor started Saturday putting down the backer board and should be finishing this week except for the items on back order (shower floor, Mandy really wanted the pebble floor) and the kitchen back splash.  

Laundry 

Master Bath Floor

Master Shower


Sunday, December 2, 2012

Drywall

Sorry its been awhile, I've been traveling a bit more plus with it being dark at 5:00 its been hard to get some pictures.  So the guys worked over Thanksgiving and got the drywall installed. 4 guys installed 200 sheets in just two days.  They finished the mud this week. 

Master Bedroom
Bonus Room

Bonus Room

Kitchen
Living Room


Zoey's Room

Living Room

The siding contractor finally got to finish now that we got the frame in the back door of the kitchen.  For now we just have some "loaner doors" in the opening.  Looks like the painter got started with the primer coat on Saturday and of coarse he painted the doors that were on loan from the supply store.  Wonder who is going to pay for that, I know I'm not.   Also the gable truss accents are not looking like what I envisioned so I have the siding guys coming back to take them down and just install some more corbels (knee braces).  I hope the painter is waiting for us to move those to finish the front.  



















We got the inside tile picked out last week so if the price comes back within budget the installer will probably start this week.  Also we plan on pouring the detached garage concrete slab this week.  I'm going to place an order for some hickory hardwood floors this week so hopefully they will be coming in soon.  We also placed the order for the kitchen cabinets this past week so they will be in a few weeks but I need to get the hardwoods floors down first.  The cabinets we picked out are painted an off white with a chocolate glaze so we decided to put the hardwoods in the kitchen also.  So the only tile floors will be in the laundry and the bathrooms.